In January 2017 Boral / PGH bricks and pavers embarked on the upgrade of their aging drying facility located at their Jindera brick manufacturing plant.

Steeltech Engineering was asked to tender for the design and installation of a new racking system that could be installed without compromising the plant’s production schedule.

The refurbishment would take 6 months to complete with the installation of 200 tons of steel racking and rail network, and the addition of the new insulated door system to the 20 dryers.